Electric Grade Single Crystal Silicon and Slices Project with Annual Production Volume of 750,000 Tons in Luanping County
項目基本情況。該項目是當前國家重點鼓勵發展的產業、產品。單晶硅在日常生活中是電子計算機、自動控制系統等現代科學技術中不可缺少的基本材料。生產單晶硅又是一項工藝技術先進、高投入、高產出的項目,產品市場前景廣闊。該項目建設年產單晶硅750噸,切片、拋光、磨片375萬片生產廠一座。計劃建廠房2萬平方米,配套設施5.8萬平方米(含宿舍及辦公用房),生產及配套設施150萬臺套,采用國內外目前最先進的生產設備和較成熟的工藝技術,生產目前較為先進的單晶硅產品。項目總投資1.5億美元。其中,固定資產投資1.3億美元,流動資金0.2億美元,全部由企業自籌。年銷售收入3.3億美元,年利稅0.55億美元,投資回收期為3.2年。
Fundamental Information of Project. The Project is a key industry and product advocated by our country. Single crystal silicon is indispensable and fundamental materials in such modern scientific technology as electronic computers and automatic control system. And, the production of single crystal silicon features advanced craft, high investment and output, which enjoys sound market future. In this Project, a factory that annually manufactures 750 tons of single crystal silicon and 3.75 million pieces of slices, polishings and abrasive films. According to plan, a workshop with an area of 20,000sqm, auxiliary facilities of 58,000sqm (including dorms and offices) and 1.5 million sets of production and auxiliary facilities shall be erected. With most advanced production facilities and relatively mature craft, we can now manufacture advanced single crystal silicon products. The Project enjoys a total investment of USD150million, among which fixed assets investment is USD130million and flow capital is USD20million. All of these shall be collected by enterprises themselves. The annual sales income is USD330million and the annual tax payment is USD55million. The investment shall be recovered with 3.2 years.
建設條件:項目擬選址在承德張百灣新興產業示范區內,該區交通便利,緊鄰國道112線,距灤平縣城10公里、京承高速灤平出口23公里,到北京僅1個半小時車程;京通鐵路和正在建設的張唐鐵路經過園區,并在區內設有客貨兩用站;水資源充沛,灤河流經27公里,徑流量19立方米/秒;淺層地下水即可實現園區近期供水,規模為10萬噸/日的供水廠正在建設中;區內現有35KV、110KV、220KV變電站各一座,承德西500KV變電站和園區專用35KV變電站即將建成投入使用;天然氣管道在區內建設中轉站一座、門站五個;現有處理能力為2萬噸/日的污水處理廠一座,并可提供中水回用,規劃建設處理能力為16萬噸/日的第二污水處理廠1座,一期6萬噸/日工程已開工建設。
Construction Conditions: the project is to be built in Zhangbaiwan New Industrial Demonstration Zone of Chengde. The location features convenient transportation and adjoins to No. 112 National Highway, 10km from Luanping County, 23km away from exits of Beijing-Chengde Highway and 1-hour drive away from Beijing. The Beijing-Tongliao Railway and the Zhangjiakou-Tangshan Railway which is being built pass through the Park. And stations for passenger and cargo trains are established in the zone. The water resources here is rich. And 27km of Luanhe passes here, with volume of runoff is 19 cubic meters per second. Shallow groundwater is enough to supply short-term water of the zone. And a water supply plant with a capacity of 100,000tons is being built. Now, there are three transformation stations with a capacity of 35KV, 110KV and 220KV separately. A transformation station of 500KV and the station of 35KV which is built especially for the zone are not being built for production. There is one transfer station and five gate stations, one sewage treatment plant with a capacity of 20,000tons/day to recycle water. And it is planned to build a sewage treatment plant with a daily capacity of 160,000tons. The first phase of this plant with a capacity of 60,000tons is finished.
項目進展情況:正在進行前期工作
Project Progress: initial work is in progress
合作意向:獨資
Mode of Cooperation: single proprietorship